The Tennessee Valley Authority governs shoreline construction across over two dozen lakes throughout Tennessee. If you're building a dock, stabilizing a shoreline, or transferring an existing permit on a TVA lake, you need a TVA Section 26a permit before any work begins. With over 1,000 TVA permits filed, Waterfront Permitting Services knows this process better than almost anyone in the state and has become the shoreline regulatory expert in the area.
Every TVA 26a application starts the same way: with a careful look at your specific lot before a single drawing gets made. We check your property's zoning, shoreline classification, and build date against TVA's current rules — because what you're allowed to build often comes down to a single date on file. From there, we prepare your application and drawings, submit to TVA on your behalf, and stay in direct contact with your case reviewer from first submission to final approval. You're never the one tracking down a status update.
With over 1,000 TVA permits filed, we've seen most of what can slow an application down — mismatched structures at transfer, missing dock spacing variances, incomplete drawings — and we build every application to avoid those delays from the start.

From the Tri-Cities to Chattanooga, we've filed TVA permits across the state — here's where we work most often.
Docks get the headlines, but TVA permits cover every kind of shoreline work. If it changes your waterfront, it probably needs a 26a permit — and we file each type the same careful way.
DocksFixed and floating structures, permitted to TVA's exact footprint rules.
Shoreline StabilizationRip rap and erosion control that protects your bank and speeds approval.
Sea WallsVertical retaining walls where site conditions make them the right solution.
DredgingSediment removal and spoil placement for deeper water and better access.We check TVA zoning and provide dock drawings to ensure viability before you spend a dime.
We assemble the paperwork and drawings. You sign. We submit with the $1,000 TVA fee.
TVA assigns a dedicated Project Lead to your file.
The TVA lead inspects the proposed shoreline in person.
We monitor the 100–150 day wait period, maintaining constant contact with TVA to prevent delays.
Your TVA 26a approval is issued. Construction begins.

Call us directly or send us your property details to get started.
Tell us about your property. We'll check agency zoning, walk you through what's possible, and handle everything from there.
Call Us Now or submit the form and a representative will reach out.